Transport of wind turbines
Motorway exit closed on Tuesday night
The diversion will be based on the existing diversion route U 34, but access to the motorway will remain possible.
A second construction phase is planned for the two nights between 14 and 16 October. Here, the slip road in the direction of Hanover will have to be closed between 10 pm and 5 am. Diversions via the Hamm-Uentrop junction will be signposted. It will still be possible to leave the A2 motorway at any time during this construction phase.

